Optimal Power Flow in the Presence of Practical Constraints and with TCSC using Imperialistic Competitive Algorithm
Keywords:
economic dispatch, ramp-rate limit, prohibited operating zones, TCSC, investment cost
Abstract
At present, power system operation, control, Management becomes very complex due to continuously increasing demand. Flexible AC Transmission System (FACTS) controllers are used to increase power transfer capability of the transmission lines closer to their limits. This paper proposed a methodology to solve Optimal Power Flow (OPF) problem in the presence of Thyristor Controlled Series Capacitor (TCSC) while satisfying system operating and practical constraints. A novel cost objective function is formulated by combining investment cost of the TCSC with the conventional fuel cost function. The proposed methodology is tested on standard IEEE-14 bus test system with supporting results.
Downloads
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
How to Cite
Published
2014-05-15
Issue
Section
License
Copyright (c) 2014 Authors and Global Journals Private Limited
This work is licensed under a Creative Commons Attribution 4.0 International License.