Assessment of Risk Management at the Design Stage of Construction Projects in Afghanistan
Keywords:
risk, construction, risk management, afghanistan, risk control, riskology
Abstract
In this study as identified above the identification of the critical factors afterwards how the management and prevention of possible risks in the design phase of the construction project are investigated rather than the problems and shortcomings encountered in this phase of the project Successful completion of this research will help us identify hazardous items in the design phase of construction projects and what steps should be taken to eliminate or minimize these risks
Downloads
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
How to Cite
Published
2023-03-24
Issue
Section
License
Copyright (c) 2023 Authors and Global Journals Private Limited
This work is licensed under a Creative Commons Attribution 4.0 International License.