Developing Kruger Shalati The Train on the Bridge A Unique Modular Hotel Construction Case Study in Kruger National Park
DOI:
https://doi.org/10.34257/GJREEVOL23IS4PG1Keywords:
new hotel development; project management; case study; modular construction; ecotourism; experiential hospitality; kruger national park
Abstract
This is a case study on the development of the Kruger Shalati The Train on the Bridge a themed luxury boutique hotel in Kruger National Park KNP South Africa Two key drivers of this project were authenticity and a strong ethos for Environmental Social and Governance ESG Considering the target market the hotel serves and the local situation this case study explains why modular construction was better to build parts of the property instead of using traditional in situ construction methods It further explains how the hotel was built and the challenges that had to be addressed to complete the project Finally it examines how the use of modular construction methods and the uniqueness of the project impacted the normal hotel pre-opening activities and ongoing hotel operations This case study has been prepared after reviewing published materials about the project and extensively interviewing five senior members of the project team
Downloads
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
How to Cite
Published
2024-01-05
Issue
Section
License
Copyright (c) 2023 Authors and Global Journals Private Limited
This work is licensed under a Creative Commons Attribution 4.0 International License.