Tabe Moses, Tchuidjan Roger, and Ngundam John. “Choosing the Power Injection Network Node Based on Overall Minimum Losses: The Case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon”. Global Journals of Research in Engineering 15, no. F1 (January 15, 2015): 1–11. Accessed May 6, 2024. https://engineeringresearch.org/index.php/GJRE/article/view/1288.