[1]
Tabe Moses, Tchuidjan Roger, and Ngundam John, “Choosing the Power Injection Network Node based on Overall Minimum Losses: The case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon”, GJRE, vol. 15, no. F1, pp. 1–11, Jan. 2015.