Tabe Moses, Tchuidjan Roger and Ngundam John (2015) “Choosing the Power Injection Network Node based on Overall Minimum Losses: The case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon”, Global Journals of Research in Engineering, 15(F1), pp. 1–11. Available at: https://engineeringresearch.org/index.php/GJRE/article/view/1288 (Accessed: 6 May 2024).