TABE MOSES; TCHUIDJAN ROGER; NGUNDAM JOHN. Choosing the Power Injection Network Node based on Overall Minimum Losses: The case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon. Global Journals of Research in Engineering, [S. l.], v. 15, n. F1, p. 1–11, 2015. Disponível em: https://engineeringresearch.org/index.php/GJRE/article/view/1288. Acesso em: 7 may. 2024.