Nahid Newaj. (2014). A Solution for the Scheduling Problem in a Multi-Plant and Multi-Product Environment. Global Journals of Research in Engineering, 14(G1), 29–32. Retrieved from https://engineeringresearch.org/index.php/GJRE/article/view/1015