Tabe Moses, Tchuidjan Roger, & Ngundam John. (2015). Choosing the Power Injection Network Node based on Overall Minimum Losses: The case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon. Global Journals of Research in Engineering, 15(F1), 1–11. Retrieved from https://engineeringresearch.org/index.php/GJRE/article/view/1288