[1]
Tabe Moses et al. 2015. Choosing the Power Injection Network Node based on Overall Minimum Losses: The case of the 216-MW Kribi Natural Gas Power Plant in the Southern Interconnected Grid of Cameroon. Global Journals of Research in Engineering. 15, F1 (Jan. 2015), 1–11.