The Economic Development of Dam Construction Projects by Applying a Critical Chain Project Management
Keywords:
kahir dam, buffers, resource leveling, cpm, ccpm
Abstract
The dam construction industry in Iran has always been considered as one of the country s most important industries due to the lack of rainfall To accomplish this we need to properly manage the dam construction process Traditional algorithms such as the Critical Paths Methods CPM and Program Evaluation and Review Technique PERT have been used since ancient times to plan and control most of the projects including dam construction projects With traditional methods of project management a large percentage of time and resources are often lost due to reasons such as the lack of prioritization student syndrome and bad multi-tasking The Critical Chain Project Management CCPM is a method for project planning with emphasis on the resources needed to carry out the project In this research which was done on the Kahir reservoir the CPM method was first used and then analyzed by CCPM method Using resource dependency identifying and embedding project buffers and leveling resources in this study reduced the implementation time of the project for 27 days
Downloads
- Article PDF
- TEI XML Kaleidoscope (download in zip)* (Beta by AI)
- Lens* NISO JATS XML (Beta by AI)
- HTML Kaleidoscope* (Beta by AI)
- DBK XML Kaleidoscope (download in zip)* (Beta by AI)
- LaTeX pdf Kaleidoscope* (Beta by AI)
- EPUB Kaleidoscope* (Beta by AI)
- MD Kaleidoscope* (Beta by AI)
- FO Kaleidoscope* (Beta by AI)
- BIB Kaleidoscope* (Beta by AI)
- LaTeX Kaleidoscope* (Beta by AI)
How to Cite
Published
2019-05-15
Issue
Section
License
Copyright (c) 2019 Authors and Global Journals Private Limited
This work is licensed under a Creative Commons Attribution 4.0 International License.